Menu
Print |

Anechoic Chambers

Semi-Anechoic Chambers for Compliance Testing Emissions and Susceptibility - Questionnaire

Chamber Size
Length
Width
Height*
Chamber Type
Required Performance Level
Chamber Registration with FCC?*:

Registration with other Governing Body?*:

Installation
By Cuming Corporation?*:

Absorber layout drawing by Cuming Corporation, but installation by customer?*:

Chamber Verification Testing Required?*:

Are you planning to use an existing shielded chamber?*:

Required New Shielded Enclosure
Modular Shielding*:

Welded Shielding*:

Screen Shielding*:

Filtered Power
Lighting
Recessed Highhat, 150 watt with vent*:

Spot lights, 150 watt*:

Strutural Support
Are electrically isolated ceiling hangers from the parent building acceptable?*:

Is a pit for positioner or turntable required?*:

Is sprinkling required?*:

Are telescoping sprinklers required?*:

Any special air conditioning or airflow requirement?*:

Any special alarms or interlock required?*:

Location – Ground floor or other?*:

Location - Loading dock access?*:

Location - Staging space availability?*:

As part of the installation, would you like Cuming Microwave Corporation to provide the following?
Turntable*:

Antenna Mast*:

Antennas*:

 Security code